Skip to main content
Submitted by admin on 11 June 2024

Spatter Dash CB

A premixed cementitious scratch/key coat for Fibred Cement Board.

<p>Spatter Dash CB a cement-based coat composed of hydraulic binders, selected aggregates, and high-performance additives. It is supplied as a dry powder in pre-weighed bags ready to use on-site, which requires only the addition of clean water to produce easily workable mortar. Spatter Dash CB is a high-quality product for applications on cement board and nonabsorbing surfaces and ceilings.</p>

Uses

  • As an internal & external scratch coat for plasters. 
  • Special Designed for Cement Board & Nonabsorbing surfaces. 
  • Plaster bond enhancer and mechanical key on horizontal, vertical, and overhead application.

Advantages

  • Factory controlled pre-blend ensures consistently high quality. 
  • Requires only the addition of water on-site at the time of usage. 
  • Manual or spray machine application or by hawk & trowel techniques. 
  • Superior workability. 
  • Easy application with uniform workflow enables high productivity & superior finishing. 
  • Internal & external applications. 
  • Suitable for humid & dry conditions. 
  • Suitable for vertical & ceiling.

Usage Instructions

The substrate should be sound, clean, free from loose material, grease, laitance, dirt curing compound, or any other substance that might impair the substrate’s bond quality.

Add to the mixing container 13.5 - 16 liters of water for each 50 Kg bag of Spatter Dash CB. Add the powder to the water and mix with a mechanical plaster mixer or low-speed electric drill fitted with a suitable paddle. Mix for 3-4 minutes until achieving a uniform, lump-free consistency. 

Blend Spatter Dash CB manually for small quantities and maintain the correct amount of powder to water. Mix for approximately 1-2 minutes until achieving a homogeneous mix.

Preferably, apply Spatter Dash CB in a single coat application to achieve the desired rough thickness of 4-6mm. 

Apply mixed material using a mechanical spray or manual spatter machine or hawk & trowel technique. Cover 95-100% of the surface area to be plastered. 

Allow the installed application to remain undisturbed for at least 48 hours.

Cure Spatter Dash CB by spraying water on the applied materials’ surfaces every 12 hours for a minimum of 3 days. During hot & dry conditions, allow curing for a minimum of 5 days. It will help to obtain high mechanical strengths and minimize the risk of surface cracks.

Clean tools and equipment with water immediately after use. Remove the hardened material using mechanical means.

EXPLORE MORE PRODUCTS

بريمكس بلاستر ال دبليو

لياسة خفيفة الوزن لأسطح AAC

Premix Plaster LW

Light Weight Plaster for AAC Surfaces.

بريمكس بلاستر اس اف

لياسة إسمنتية مسبقة الخلط مع ألياف